You are here: Home › Manual › Reading the Panel
Section 1 · Reading the Panel

Everything happens on one screen. There are no menus to hunt through. Once you can read the four regions of the panel (the tracks, the junction and main line, the working timetable, and the score line) you can work any board on the network.

The panel, top to bottom

Meridian Yard • Operator • Shift 06:00 to 13:00 • Snowy • 06:19

Mission: survive the rush • clear 90% of services.

1OCC
2OCC LATE
3OUT
4clear
JunctionSVC 4850 in junction
Main lineSVC 8779 on block
Working timetable: 1 / 50 cleared • Score line: cleared · holds · late min · lockouts · on-time %
Figure 1. The whole panel is one screen: the four regions are described below.
The four regions

The tracks (1–9)

Each numbered track is a platform, drawn as a bar that fills as a train arrives and works down it. To the right of each track are four lamps that tell you its state at a glance:

LampMeans
OCCOccupied. A train is berthed here.
OUTCleared out. The train has been released.
LATEThe berthed train is running late. The clock is against you.
FLTFault or lockout. This track is locked. File a report to clear it.

The signal shown against each track carries its aspect: red = stop, amber = approaching, green = clear to move.

The junction and the main line

These are the two shared blocks. Only one train may be in the junction, and only one on the main line, at any time. That single rule is the whole safety case of the railway. Route a second train into an occupied junction, or release onto a busy main line, and you foul the block.

The working timetable

Your list of jobs for the shift, in time order. Read each row left to right:

ColumnWhat it tells you
TIMEThe booked time of the move.
MOVEARR arrival · DEP departure · PASS pass-through.
TRKWhich track the move belongs to.
SERVICEThe service id (e.g. SVC 4850).
LOADPassengers aboard. Heavier trains are worth more, and cost more if you delay them.
STATUSDUE, BOOKED, DELAYED, or a late count like +4 LATE.

The score line

Along the bottom: services cleared, grace holds remaining, total late minutes, lockouts, and your on-time %. Keep the on-time high and the lockouts at zero and the grade takes care of itself.

Next: Working a Shift ›